project
Project: Lane Cove
Date:
October 2024
Project location:
Lane Cove, NSW
Client Brief:
Restore power to the building after the collapse of a private pole and address any defects to prevent future electrical issues.
Work:
– Connected a generator to supply temporary power during repairs.
– Installed a new 60-metre underground cable from the street to the main switchboard in the basement car park, running it beneath the driveway slab.
– Completed minor switchboard repairs to meet safety standards.
– Ensured the public pathway remained accessible and safe throughout the project.
– Reinstated the driveway and garden to pre-work condition.
Outcome:
The power was restored successfully, with all defects resolved. The project was completed with minimal disruption to residents, and the site was fully reinstated. The building’s electrical system is now future-proofed, ensuring long-term safety and reliability.



Project: Kangaroo Valley

Date:
September 2023
Project location:
Kangaroo Valley, NSW
Client Brief:
Wire and install all requirements for passive home construction as per the plans provided.
Work:
Work with Your abode building to construct a new passive home for clients.
Outcome:
Project has been constructed to architects specifications. Construction passed passive home requirements and clients have moved in.